Больше информации по резюме будет доступно после регистрации

Зарегистрироваться

Candidate

Male, 38 years, born on 3 May 1987

Karachi, willing to relocate, not prepared for business trips

Engineer

4 000 $ in hand

Specializations:
  • Other

Employment: full time

Work schedule: full day

Work experience 14 years 8 months

January 2015currently
10 years 6 months
Saudi Electricity Company

sec.com.sa

Distribution Engineer
• I am responsible for Supply Chain Management and Distribution Material Planning • Responsible for Material Forecasting, Forecast reviews in accordance with assigned budget • Responsible to analyze SAP generated forecasts on reasonableness and accuracy • Responsible for Auditing reports on material expenditure and demand • Responsible to analyze changing material demand patterns • Responsible for interface with vendors and forecast material integrity • Responsible to investigate regional demand enquiries, schedule changes and cancellations • Responsible to determine, research and correct material inventory discrepancy causes • • Responsible for Prepration of Scope of work of project called FTTx (Fiber to the X), It involves to enquire about the following: o Business case validation of FTTx deployment within distribution system for distribution automation (Smart Grid systems and Smart metering) o Review and assesment of current capabilities of organization in fiber optics communication systems o Strategic planning for multiple FTTx deployment business cases o Stakeholder Management and Vendor Strategy o Construction standards and specification particularly for distribution network o Synchronized engineering desing with existing network and network architechture • Responsible for Coordination with consultant working on FTTx project • Responsible for Coordination with highly reputed consultant called Arthur D Little (ADL), working on the “Optimization Measure: Lean Inventory Management- Quantification in SEC • Responsible for Coordination with highly reputed consultant called “Accenture” experts in implementing SAP. SPP solutions and working on implementing SAP SPP in SEC to improve Material Forecasting and Inventory optimization • Responsible for Prepration of different weekly and monthly reports and submission to authority • Part of Saudi Electricity Company Expert Action Plan 2015 aiming to improve technical and other professional skill of its participants • Responsible for Monthly report on Financial savings for initiative Called Go-Aluminum • Responsible to Working on our mission to attain 97% forecast Accuracy by the end of 2020
March 2012September 2014
2 years 7 months
Al Faiha Al Waedah Co, Oman

Oman

Senior Electrical Engineer
• Responsible for Coordination with Mazoon Electricity Company • Resposible for Material Management and Planning • Resposible for Material procurement, stocking and de stocking of material • Resposible for Preparing main schematic for the whole power distribution, Lighting, Small power & ELV System layouts for Commercial buildings, Apartments, Villas, Accommodation & Schools. • Resposible for Preparation of Weekly Progress Reports and present to the concerned authorities • Resposible for Preparation of Monthly Progress Reports and present to the concerned authorities • Resposible for slarification of critical and technical aspects of ongoing projects • Resposible for Make necessary change in work plan where it is needed • Resposible for Ensure Work Quality according to project requirements • Resposible for Ensure Health safety and Environment rules as per DCRP (Distribution Code Review Panel) Oman Standards
August 2010February 2012
1 year 7 months
Flowtronix, Lahore Pakistan

Pakistan

Electrical Design Engineer
• Responsible to manage & control project execution work from basic Engineering to detailed Design Engineering • Preparation of various engineering deliverables like Electrical One Line Diagram, Cable Routing, Grounding Layout, Panel Schedule, Interconnection Diagram, Cable Layout and Electrical Calculation • Responsible for prepare Electrical load list • Responsible for Power & lighting, • Earthing & Cathodic protection system layout drawings • Sizing calculation for generators, transformers & ups • Designing of LV switch gear, MCC, Control panels; MCC room / substation layout drawings • Single line diagram • Hazardous area classification diagram & typical installation diagrams • Cable sizing & cable scheduling, building electrification work • To prepare project progress measurement reports based on docs. Issuance milestones • To prepare requisitions for the procurement of electrical equipment & material and prepare technical bid evaluation based on vendor documents review. • To prepare & implement electrical equipment installation, testing & commissioning procedures for the quality control of construction work

Skills

Skill proficiency levels
SAP
Visual Basic
C++
MS Office
Python
MS Outlook
MS Visio
MS Project
AutoCAD

About me

My hobbies are: Searching and reading about new engineering technologies I am a team player and Service Orientated, have excellent internal and external communication skills

Higher education (bachelor)

2010
University of Central Punjab Lahore
Electrical Engineering, Electrical Engineering, Electromechanics and Electrical technologies

Languages

UrduNative


ArabicA1 — Basic


EnglishC2 — Proficiency


PunjabiC2 — Proficiency


Citizenship, travel time to work

Citizenship: Pakistan, Russia

Permission to work: Oman, Pakistan, Russia

Desired travel time to work: Doesn't matter