Больше информации по резюме будет доступно после регистрации

Зарегистрироваться
Was online more than two weeks ago

Candidate

Male, 34 years, born on 20 December 1990

Karachi, willing to relocate (Azerbaijan, Belarus, Georgia, Other regions, Kazakhstan, Kyrgyzstan, Russia, Uzbekistan), not prepared for business trips

The approximate area of the job search is specified

Engineer (Electrical & Instrumentation )

2 000 $ in hand

Specializations:
  • Other

Employment: full time, project work

Work schedule: full day, shift schedule, flexible schedule, remote working, rotation based work

Work experience 12 years 11 months

September 2016currently
8 years 10 months
Cherat Cement, Nowshera Pakistan

gfg.com.pk/ccl

Assistant Manager Electrical & Instrumentation
1) Coordination with our management to complete tasks on time. 2) Make schedule to meet deadlines and minimize man power. 3) Worked on erection & commissioning of new SINOMA (TCDRI) 4200 T/D cement plant. 4) Lead our team in installation of Motors, Electrical LV/MV Panels, Transformers, VFD’s & instruments, loop testing, cable laying and cable termination. 5) Now working as Shift and Maintenance Engineer.
January 2014September 2016
2 years 9 months
Dewan Cement, Karachi Pakistan

Karachi, www.dewancement.com

Chemical Production, Fertilizers... Show more

Sr.Electrical Engineering
Assignment: 1) Coordinate with our higher management to make well planned schedule to meet the dead lines and minimize power losses. 2) Leading our teams and giving them proper technical support regarding Cement mill, Grid station and Coal Plant. 3) Designing, Manufacturing & installation of electrical panel, Fault tracing on Electric panel, commission and trouble- shooting of PLC’s, VFD’s and work on power factor panel. 3) Pneumatic equipment installation, control and optimization. Project: 1) Erection of vertical cement mill LOESCHE GmbH (150 Tones). Supervision of the erection and commissioning of the whole project, giving daily reports to our manager. 2) Look after and supervision of the Schneider Electric as outsource, provide them complete layout of the project, Regarding electrical drives termination, cabling and LV, MV panel installation.
June 2013December 2013
7 months
Sind Feed & Allied Products

Pakistan, www.sindfeedsalliedproducts.enic.pk/

Chemical Production, Fertilizers... Show more

Electrical Engineer
1) Coordinate with our General Manager and Production Manager to make well planned schedule to meet the dead Lines and Send the monthly report to our Admin manager. 2) Designing, Manufacturing & installation of electrical panel. Leading our teams and giving them proper technical support regarding winding & look after of 3 phase motor (1HP to 335HP), overload control (Current, voltage & Phase) of 3 phase motor. 3) Silos elevators control and load management. 4) Star & delta connection, soft-starter & inverter control of 3 phase motor also commissioning and troubleshooting of PLC. 5) Commissioning and troubleshooting of Van-Aarsen (C-750), SALMATEC, CPM pellet mills and mixer plant. 5) Pneumatic equipment installation, control and optimization. Boiler look after and its automation, Gas and argon welding.
December 2012June 2013
7 months
ZTE Pakistan

Pakistan, www.ztezhongxingtelecompakistanpvtltd.enic.pk/

Telecommunications, Communications... Show more

Site Engineer
Production: Installation Of ZTE & NEC Equipment. System: ZTE SDR (ZXMG 8700, 8800, 8900) Telenor Vega Project (MW & SDR swap) Project: ZTE-Telenor swap Project Project: NEC IPASO link Project Assignments: 1) Look After all the installation configuration, commissioning of SDR Expansion & Transmission expansion. 2) Give proper Technical support to our teams regarding SDR installation, testing, commissioning and complete transmission documentation and reporting of PATs, 3) Coordinate with our internal Project Manager and External Project Manager, Co-ordination with authorized people for preparing the Planning send the daily report to our Project Team. 4) Carrying out Technical trainings regarding ZTE SDR equipment and also about NEC IPASO for or teams and also for other associated subcontractors. 5) Carrying out the site surveys for the proper installation. Make well planed schedule to meet the dead lines.
August 2011November 2011
4 months
NTDC (Sheikh Muhammad 500KV Grid) Peshawar Pakistan

Pakistan, www.ntdc.com.pk

Power Industry... Show more

Trainee Engineer
I have gained experience in the maintenance and troubleshooting of power transformers, CTs, PTs, Station Batteries, Battery chargers, etc as per detail given below. a)Power transformer testing including open circuit test, short circuit test, b)Opening and closing time of circuit breakers, c) Complete maintenance and installation of circuit breakers.

Skills

Skill proficiency levels
Project management
MS Project Expert
Team management
MS Excel
MS PowerPoint
Presentation skills
Time management
Electronic systems installation
Electrical

About me

Internet Surfing, Hunting, Fishing, Travelling, Reading, Singing

Portfolio

Higher education

2016
Hamdard University, Karachi Pakistan
ME Electrical Engineering, Electrical Engineering, Electromechanics and Electrical technologies
2012
CECOS University, Peshawar Pakistan
BSc Electrical Engineering, Electrical Engineering, Electromechanics and Electrical technologies

Languages

PashtoNative


EnglishC2 — Proficiency


UrduC2 — Proficiency


Citizenship, travel time to work

Citizenship: Pakistan

Permission to work: Pakistan

Desired travel time to work: Doesn't matter